The prefabricated substation utilizes modular “Building block” structure for flexible arrangement as per land requirement and can be arranged multiple configuration to maximize use of available space. It takes less land space of 550-850 Square meters and less construction time only about 6 to 8 months, as compare to conventional GIS substation which takes 18-24 months construction and upwards of 2000 Square meter space. Our modular compact substation doesn’t require any traditional buildings and wall constructions. It is environmentally friendly, since it doesn’t release any radiation and does not contribute towards ambient noise pollution.
E-Houses are customized, pre-assembled, pre-tested and are plug-and-play solution for modular substations. They are ideally suited for use in situations where interim solutions are needed, or in locations that are difficult to access. They provide a rapid and flexible power supply, precisely where it’s needed. E-Houses have proven themselves as an alternative to conventional power distribution solutions. They are quickly and can be easily set up, since E-House is built and pre-tested at the factory, and then assembled, connected and put into operation on-site. E- Houses have been installed in large numbers throughout the world in industry and infrastructure, and for network operators.
E – Houses are Building Block of the modular substation
Building Blocks
Substation modules are designed to maximize use of available space and can be arranged to fit a wide variety of location. Layout design according to land available:
Modules:
key Components:
E-Houses & Switchgear are KEMA Certified. We do have international quality management standards (ISO 9001 and ISO 14001:). We are fully committed to delivering the utmost quality products.